- Research
- Open access
- Published:
A full response chain surge capacity test of a small rural hospital, prehospital resources and collaborating organisations
Scandinavian Journal of Trauma, Resuscitation and Emergency Medicine volume 33, Article number: 55 (2025)
Abstract
Background
Increased surge capacity is key in mass casualty incidents. Rural hospitals face other challenges in terms of transport capacity and available resources. The aim was to examine if a simulation system previously used to test surge capacity at large hospitals, could be used to test surge capacity at a small rural hospital.
Method
A qualitative study was conducted to assess surge capacity at a small rural hospital using a previously validated simulation system. The simulation system was adopted to the Norwegian trauma system and local context. New simulated patient cards were developed, inspired by traffic victims. A tunnel accident scenario involving a bus, a heavy goods vehicle and a motorcyclist was used. Test staff ensured that real consumption of time and resources were followed. 98 persons representing 16 organisations, participated. A post-test survey was collected.
Results
Access to the scene and transport resources were bottlenecks in the initial phase. The emergency department and lack of surgeons and anaesthetic doctors in the trauma team became the first and most prominent in-hospital surge capacity limiting factors. Operating theatre reached surge capacity, but never exceeded. The intensive care unit avoided depletion of beds/staff/ventilators due to transfer of patients to the trauma centre. Surge capacity was enhanced by obtaining staff, blood and equipment from the trauma centre. Water lock systems and replenishment routines for chest tube trays was inadequate. Blood supply was insufficient in the initial phase and a lack of overview of blood products was identified. Some communication gaps and deficiencies in victim identification were detected. The hospital participants evaluated the method as useful in assessing hospital surge capacity. Half of the participants requested increased time to learn the system pre-test. The inclusion of several organisations in the mass casualty incident exercise was appreciated and ranked high as a simulation training.
Conclusion
The simulation system provided detailed data to determine surge capacity and capacity-limiting factors in the mass casualty incidents response at a rural hospital and performed as a training tool for staff. Methods to improve pre-test simulation system knowledge should be examined. Broad inclusion of cooperating organisations was found beneficial.
Introduction
Improving hospital preparedness for mass casualty incidents (MCI) and major incidents (MI) is a crucial part of disaster resilience [1]. Experiences from previous terrorist attacks in Europe indicate that hospitals located near the incident are likely to receive a high number of casualties, mandating that hospitals need to be prepared for these rare, but potentially complex events [2,3,4].
There are several attempts to define surge capacity (SC) in literature, but no prevailing definition exists [5, 6]. Stratton et al. define SC as the ability to manage a sudden increase in the number of patients after a disaster or an emergency, as opposed to daily patient care [7]. Hick et al. suggest the 4 S`s as key factors in SC; “system, space, staff, and supplies” [5]. Differences in taxonomy and lack of standardised benchmarks for assessing SC, complicates the comparison of hospitals in terms of data and contingency framework. However, it is undisputed that knowledge about the hospital’s SC, capacity-limiting factors and strategies to increase SC is crucial when the disaster hits [8,9,10]. Different methods to assess and enhance SC have been suggested [11,12,13]. The Mass Casualty Simulation System (MACSIM®) simulation system was developed to compare MCI/MI triage methods and was further used to train participants “full-chain” in a post-graduate course, Medical Response to Major Incident (MRMI) [14, 15]. The MACSIM® system has also been applied as a method to examine hospital SC at 3 larger Swedish hospitals [16, 17]. SC testing by the MACSIM® methodology has never been conducted in Norway and never at a hospital with < 300 beds-capacity.
Bachmann et al. identified communication, triage and transport as 3 out of 4 key elements in MCI/MI preparedness [18]. Norwegian national guidelines describe prehospital cooperation, communication lines and responsibilities [19, 20]. Figure 1 illustrate the Norwegian prehospital system as described in the article by Ugelvik et al. [21]. The national trauma plan defines patient flow to acute hospitals with trauma function (NTC) and trauma centres (TC) [22]. Traffic accidents and high energy falls are the most common causes of trauma in Norway [23].
Voss Hospital (VH) is an NTC with 64-beds capacity, located in the western part of Norway 100 km from the TC, Haukeland University Hospital (HUH) [22]. The trauma volume is low [23]. Compared to HUH, VH faces several limitations in terms of space, staff and supplies. Transport resources in the region are likely to be constrained in an MCI/MI, especially in adverse weather conditions. There are several single-tube road tunnels with bi-directional traffic and longitudinal ventilation in the region. Steep, narrow, bending roads frequently experiencing rockfalls, snow avalanches and landslides onto/over the roads. Consequently, patient transport and patient flow are not only influenced by triage, coordination and communication, but also by environmental conditions. Cooperation with HUH is crucial in terms of patient referral and possible enhancement of SC, as staff and supplies can be distributed from HUH. An intermunicipal out-of-hours emergency primary health care service (OOH) is also located at VH and operative between 4:00 pm-8:00 am on weekdays and throughout the weekends. Being a rural hospital with inherent limitations in SC, put coordination, communication and cooperation to the test.
The aim of this study was to investigate if a simulation model could be used to assess SC and capacity-limiting factors at a small rural hospital, conducting a full chain MCI exercise involving relevant civilian organisations to test transport resources and cooperation.
Method
A qualitative study to assess SC and capacity-limiting factors at a small rural hospital using the MACSIM® methodology was conducted. Qualitative and quantitative data were collected and analysed.
Planning phase
Early leadership commitment and local involvement were aimed for (Fig. 2). The SC test called “Vossa-test”, was designed as an MCI/MI exercise for non-medical participants to test communication, collaboration, transport capacity, media/social media management and patient identification (Fig. 3). In addition to the general aims, each participating organisation was encouraged to define their own specific learning goals (Table 1).
Tunnel security experts and local tunnel construction personnel contributed to the development of the scenario. The Stalheim tunnel, characterised by its steep and bending structure and lack of escape channel, served as the site of the accident. The tunnel accommodates heavy goods transport and has seasonal high volume of bus tourism. The scenario involved a rock avalanche blocking the tunnel exit. A heavy goods vehicle (HGV) marked with general warning signal for dangerous goods (lithium batteries) failed to stop in time and collided with the avalanche. This collision was followed by a bus carrying elderly German tourists crashing into the HGV and a motorcyclist who struck the bus resulting in 60 casualties. A detailed exercise plan was created to ensure coordination among instructors.
The MACSIM® system is described in detail by Lennquist Montán et al. [15,16,17]. The table-top system consists of magnetic boards with the available physical spaces, personnel categories, transport resources, patient cards and treatment tags indicating time consumed (Additional file 1). The components of the MACSIM® simulation system were translated to Norwegian and adapted to the Norwegian trauma system. New patient cards inspired by traffic accident victims were produced. The realism of each patient case, decisions about timelines for action, optimal treatment and consequences of delayed or lack of optimal treatment was set by the expert opinions of some of the co-authors with advice from different medical specialists. Instructors, protocol writers and participants received simulation system training before the SC test.
An inventory for supplies was conducted 1–3 months prior to the test. Activation of an MCI/MI test alarm on March 20, 2024 (5:30 pm), served as a base for medical staff availability during the test. Transport resources and bed capacity was based on actual occupancy rate on April 15, 2024. Blood supply inventory was gathered on April 16, 2024.
Conduct phase
A total of 98 individuals participated in the “Vossa-test” on April 17, 2024. The test staff consisted of 1 SC test leader, 26 instructors, 12 protocol writers and 11 evaluators. While the “Vossa-test” was conducted during office hours, the scenario itself was set out of office hours (5:30 pm) to include the OOH. The national radio communication system and a phone directory were readily available to all participants. Participants wore uniforms and brought their emergency equipment. Phone calls, media and social media messages were distributed at predefined times.
The emergency services had to evaluate the risk by gathering information about the tunnel and the heavy goods vehicle load. Victims had to be evacuated through the tunnel entrance. Some of the victims had self-evacuated by foot or by private cars to the tunnel entrance and some to VH in private cars. Instructors challenged the non-hospital participants in terms of MCI/MI risk analysis and communication. The exercise plan described dynamic changes in environmental conditions that affected helicopter and road transport. Real-time data was used to determine transport times to and from the scene of the accident and between hospitals.
The participants had to make active decisions to empty departments of non-trauma cases. In accordance with previous MACSIM® SC tests, instructors were equipped with supplementary information including X-rays, lab results and surgical findings for each patient [16, 17]. Instructors ensured that necessary resources to examine and treat patients were adhered, that predefined consumed time on procedures and actions were followed, updated changes in patient conditions and declared deaths when predefined time-limits were exceeded.
Debriefings were held at the test-stations followed by a joint gathering. Feedback has been provided orally to the hospital management combined with a detailed SC evaluation report.
Analysis phase
Several methods were used to gather qualitative and quantitative test data.
-
Patient cards using MACSIM® methodology as elucidated by Lennquist Montán et al. [15,16,17].
-
Protocol writers recorded time data at the test-stations.
-
The MACSIM® patient cards were collected after the test, with all treatment and investigation tags left on the card (Additional file 1).
-
-
Logs provided qualitative data regarding timelines and decisions.
-
Exercise plan.
-
Evaluator logs.
-
Emergency medical communication centre log.
-
Hospital command group (HCG) log.
-
Oral debriefs notes.
-
-
Participants evaluation.
-
The software Webropol (Webropol, Helsinki, Finland) was used to collect evaluation from participants.
-
The web-based survey consisted of a maximum of 30 questions depending on the employee’s organisation. Only health personnel were asked to evaluate the MACSIM® methodology as a surge capacity assessment tool (Additional file 2).
-
Data was collected from 19.04.2024–17.05.2024.
-
Statistics
Microsoft Office 365 Excel Version 16.0 (Microsoft Corporation, Redmond, WA, US) and SPSS Statistics for Windows, Version 29.0 (IBM, New York, NY, US) were used for analysis. Percentages, median and IQR were applied for descriptive statistics.
Results
Running the test
Prehospital
The road information central received a phone call from within the Stalheim tunnel, reporting an accident (Fig. 4A). The first response unit arriving at the scene was the fire brigade, describing chaos outside the tunnel and estimated 32 victims (Fig. 4B). A decision was made to await more resources before entering the tunnel. Activation of red alert level followed (Fig. 4C).
The OOH arrived with the first ambulance and functioned as medical leader health. An incident command post was established. The first arriving anaesthetic doctor from the helicopter emergency medical service (HEMS) prioritised and treated patients, instead of transporting patients one by one. Due to fear of explosion, the ambulances were delayed access to victims inside the tunnel. After access, a suspicion of leakage from lithium batteries resulted in tunnel evacuation and the establishment of a 300-meter hot zone, before the tunnel was finally reopened. Different modes of patient transport were used (Table 2).
In-hospital triage
Triage was performed by a surgeon and partially by OOH (Table 3; Figs. 5, 6 and 7). Undertriage was found to be low, 3/53 (5,7%). Of the “category-red” patients, 6/17 (35,3%) had injury severity score (ISS) < 15 and the average ISS was 24,4 (4–57) (Table 3). One patient was triaged blue.
Surge capacity
System
External communication and collaboration were generally good, supported by established relationships and participants being used to collaborating. Some challenges in delayed and missed communication and victim identification were detected. Examples of communication challenges included decision regarding tunnel access for health, when the last patient left the scene of the incident and clarification related to CBRNE threat.
Space
Measures to enhance SC were initiated when the red alert was activated. In total, 13 patients were transferred to HUH by helicopter (Fig. 7). The test provided detailed information regarding the transferred patients and need for ventilators, surgery and radiology.
In the ED trauma room, a maximum of 3 reduced trauma teams could work simultaneously. Additionally, hospital doctors used 2 rooms and the OOH 8 rooms in the ED. The ED trauma room became a bottleneck in the initial phase (Fig. 8). SC was reached and exceeded for patients triaged red. The waiting time between triage and examination was on average 6 (2-16) minutes for red patients. Average time used for patient examinations in ED (excluding OOH), were 16 (2-55) minutes and 17 (9-29) minutes for red patients. Four patients died in the ED (Fig. 8).
Bed occupancy for trauma in emergency department. Excluding one patient triaged yellow without the need of trauma team and patients managed by out−of−hours primary health care (OOH). Includes two patients that were initially triaged for OOH, but was retriaged as red. Timeline includes waiting time for examination and examination time
The operating theatre (OR) reached SC, but did not exceed (Fig. 9A). No immediate patients were delayed for surgery due to lack of OR. Laparotomy was the dominating surgical procedure (Table 4). One patient died after arrival in the OR due to abdominal bleeding and one laparotomy was negative. By test-end, four patients were still waiting for surgery to avoid loss of function or complications. The OR would have been under further constrain if more patients had arrived VH alive and if patient transfer to HUH had not been possible.
The intensive care unit (ICU) and post operative care (PO) each have an 8-bed capacity. The PO capacity remained adequate and underutilised throughout the test (Fig. 9B). The ICU experienced two peaks (Fig. 9C). Without patient transfer to HUH, the ICU would have surpassed SC (Fig. 9D). Ward capacity was sufficient as patients not related to the event were discharged, moved to gynaecological wards or to a nursing home. Radiology was ordered on paper and limited by one CT scan (Table 5). Challenges were noted in prioritising radiology referrals.
Staff
The number of surgeons in the surgical trauma team was a main limiting factor and SC was exceeded (Fig. 10). A surgeon was used in a combined function as triage responsible and medical leader. After the arrival of mobilised staff, the hospital had a maximum of 2 surgical consultants to advise the trauma teams and operate patients. Further, a maximum of 3 anaesthetic and 2 orthopaedic consultants were available during the test. Other professions assisted patient transport as there were a maximum of 3 porters available.
Voss municipality offered 50 nurses to support VH. Some of these nurses were put in duty for a 3-hour period. The HCG requested transfer of staff from HUH to support VH (5 vascular surgeons, 5 anaesthetic doctors, 3 anaesthetic nurses and 3 operating nurses arrived VH 9:51 pm).
Supplies
The HCG had regular meetings with HUH. Equipment was requested and transported to VH by ambulance (Table 6). Voss municipality donated 50 sets of patient clothing. VH had sufficient supplies of most equipment (Table 6). Before the first patient transfers to HUH, ICU had only one ventilator available. With a lower prehospital mortality rate or lack of patient transfers, the number of ventilators needed would have exceeded SC. The ED lacked a system for refilling the tray for chest drain insertion and the number of water locks was insufficient (Table 6). Additionally, there were limited quantities of pre-made major dressing kits, pelvic binders and tourniquets, but tourniquets and pelvic binders were also available prehospitally.
Blood supply
The consultant on call at the blood bank (HUH) was informed early about a potential disaster (5:59 pm). The internal blood bank procedure for emergency collection of whole blood (“walking blood bank procedure”) was started 6:16 pm and 50 whole blood donations planned. The blood supply was discussed within the HCG 6:17 pm. The Blood Bank at HUH sent two loads of blood products with search and rescue helicopter (SAR) and HEMS.
In total, 13 patients received blood transfusion, 11 in-hospital. Four patients received blood prehospitally (4 units of whole blood). The blood usage was lower than expected based on the type and severity of injuries. The prehospital mortality (7/60, 11,7%) contributed to a lower-than-expected usage of blood transfusion in-hospital. Two patients needing a massive transfusion (MTP) to survive never arrived at VH. Of the patients transferred to HUH, one patient demanded MTP until definitive vascular repair. Four patients died due to internal bleeding after arrival at VH. One of them received 1 unit of lyophilised plasma at VH and one had received 1 unit of whole blood prehospitally. The clinicians were initially reluctant to order blood transfusion as the supply was regarded as insufficient. A lack of an established dynamic communication line regarding blood supply was detected. The availability of transfusion with platelet-containing blood products was limited.
Mortality
Delayed access of health services to the victims inside the tunnel resulted in 4 prehospital deaths. The test had a mortality rate of 14/60 (23,3%) and 9/14 (64,3%) of the deceased had ISS > 25 (Table 7). With the right optimal treatment, 10/14 (71,4%) of the patients could have survived and 5/14 (35,7%) with normal level of function. Two of the deceased had moderate injuries with ISS < 15 (Table 7). Bleeding was the main cause of death (Table 8). The triaged blue patient died in the ward due to flail chest/pulmonary contusion and lack of ventilator treatment.
Evaluation of the test
A total of 91/98 (92,9%) of the participants responded to the survey. The hospital`s respondents found the MACSIM® system useful to estimate SC (Table 9). Of the medical participants, 27/52 (52,9%) requested more time pre-test to learn the MACSIM® system. Most medical participants ranked the “Vossa-test” high regarding improvement of the participants own role in an MCI/MI (Table 9).
Participants regarded the wide range of participators as beneficial, and the scenario was ranked high (Table 10). Improved knowledge about the participants own role and tasks during an MCI/MI was reported by 76/91 (83,5%) and the participants evaluated the “Vossa-test” to be a valuable MCI/MI simulation exercise (Table 10).
Discussion
The methodology used was evaluated as a suitable tool to estimate SC and capacity-limiting factors at a small rural hospital. Inclusion of the most relevant civilian organisations for an MCI/MI response in the chosen scenario was valuable.
WHO recommends that hospitals “calculate maximal capacity required for patient admission and care based not only on total number of beds required but also on availability of human and essential resources and the adaptability of facility space” [24]. Studies indicate that there is a lack of knowledge regarding SC [25,26,27]. There is no consensus which method to apply for SC estimation [9, 17, 28,29,30,31]. Focusing on the numbers of beds and surgical teams alone is insufficient as organisation, communication and staff competency/skills are important factors [3,4,5, 32,33,34,35]. A full chain test method with figurants is resource demanding [36]. The MACSIM® system can be used simultaneously with normal hospital activities.
MCI/MI bring inherent uncertainty, posing significant challenges to the organisations involved in the crisis management. Previous MCI/MI events have proven that cooperation and communication is of major importance [4, 33, 37,38,39]. The SC test was designed to address the importance of external cooperation and communication, factors shown to be important in disaster management at small hospitals [39, 40]. The broad inclusion of participating organisations was valued by the participants. A traffic scenario in MACSIM® simulations had previously never been applied. Based on the feedback from the participants, the scenario was realistic. Rural hospitals face other challenges than larger hospitals when the disaster strikes [2, 32]. Limitations in terms of physical space, specialists, number of staff, equipment and blood supply are likely. Access to emergency medical transport resources is scarcer in rural areas [39]. Sarzynski et al. revealed concerns regarding disadvantages in transport availability at small rural hospitals during the Covid pandemic surge [41]. Hence, knowledge about the hospital`s SC is potentially more crucial at a rural hospital. The MACSIM® method has previously been applied to assess SC at larger hospitals [16, 17]. Our study indicates that the method is valuable also for SC estimation at a small rural hospital. Cooperation with the TC was essential to enhance SC at VH. Based on the “Vossa-test”, TC participation in the SC test of a rural hospital could be recommended. In accordance with the Swedish study, requirements for increased pre-test time for the participants to learn the simulation system was detected [16]. A mandatory on-line course for participants introducing the MACSIM® methodology could possibly enhance the participants pre-test skills.
Experiences from the “Twin attack” in Oslo 2011 showed that experienced surgeons in key functions were an important part of successfully managing the MCI [2, 32]. Correspondingly, VH placed a surgeon as triage responsible. In accordance with the computer models of Hirshberg et al., the lack of surgeons became the most obvious bottleneck in terms of SC at VH [42]. The number of major incident trauma teams was also a limiting factor in the Swedish SC tests [17]. In contrast to Ullevål Hospital (TC), Ringerike Hospital (NTC) experienced limitations in the number of available surgeons during the Utøya shooting in 2011 [2, 32]. Adaptions to the contingency plan regarding triage, trauma team composition and access to general surgeons had to be applied [2]. VH is considerably smaller than Ringerike Hospital. As a comparison, VH had 52 trauma alarms in 2022, whereas Ringerike Hospital had 254 [23]. These findings indicate that rural hospitals with limitations in crucial members of the trauma team must take this deficiency into consideration in the contingency planning. Small rural hospitals face the dilemma of placing surgeons in important roles as triage and medical leader role, which might critically reduce the number of available surgeons in the trauma teams and OR. The use of other trained staff in these functions should be considered.
Regarding physical space and patient flow, the pattern with ED receiving the peak first, followed by OR and ICU, correlated with the findings from the Swedish SC tests [17]. In contrast to the Swedish SC tests, the OR SC was reached at VH [17]. The time delay until the ICU peaks, needs to be acknowledged early to avoid exceeding capacity. Coordination and communication regarding patient referrals are crucial for hospitals with limited ICU capacity. Airborne traffic can be limited due to weather conditions, which must be taken into consideration in the contingency planning. Ward bed-capacity was sufficient and resembled previous MACSIM® SC test results and experiences from MCI/MIs in Europe [5, 17, 43]. Access to CT scan limited the use of supplementary radiology in the test. Previous MACSIM® SC tests have indicated that transfer of patients to CT locks up trauma team resources [17]. The use of CT scans in relation to the trauma reception was limited at both NTC and TC during the Utøya shooting in 2011, as opposed to the use of CT scanning for 83,8% of the trauma patients in Norway in 2022 [2, 23, 32].
Extra ventilators were requested early from HUH and the transfer of patients to HUH enhanced SC. The strategy of referral of ICU patients from NTC to TC was applied after the shooting at Utøya [2]. In the Las Vegas shooting, an improvised system with Y tubing was used to ventilate two persons with an estimated same size to compensate for a critical deficiency [44]. Despite larger bed-capacity in the Swedish tests, deficiency in supply of disposable surgical material and sets for external fixation were identified [17]. Sets for external fixation were limited at VH, but a plan to use one set on two patients was implemented. Only one orthopaedic surgery took place as laparotomies were prioritised. VH had insufficient quantities of water-lock systems for chest tubes, indicating the importance of running dynamic SC tests with inventory. Implementing a disaster storage with the necessary medical equipment to manage predefined critical events, based on risk analysis, could be an additional solution to enhance SC for supplies.
Early and balanced blood transfusions for patients with critical bleeding is crucial [45, 46]. Blood supply at VH is limited, and the simulation method gave detailed dynamic information about supplies and use of blood products. Many of the NTCs in Norway lack thrombocytes to provide an early and balanced blood transfusion, as recommended in the national trauma plan [22]. VH has since 2019 had 2 whole bloods in the stock [47]. Blood supply was early on the agenda during the test, and two loads of blood supply was transferred from HUH. The blood bank at HUH has been an active part of whole blood implementation in Norway [47,48,49]. The test detected that there was a discrepancy between the actual blood supply and the clinician’s assumption. Fear of running out of blood prevented some of the first arriving patients to be transfused. Implementing good routines regarding dynamic overview of the blood supply at the hospital is an important area of improvement. Establishing whole blood preparedness through walking blood bank is feasible and should be investigated as a strategy for VH, both for a single patient requiring massive transfusion protocol or in an MCI/MI situation [49,50,51,52].
Victim identification was detected as an area of improvement. The list of fatalities after the terrorist attack in Norway in 2011 was released to the media 4 days after the attack, although the forensic identification was not completed until 5 days after that [53]. The 22nd of July commission stated that the collaboration between health and police regarding information and following-up routines of relatives should be considered [53]. The identification process is composed of a forensic part involving the deceased, but also include patients that are unable to identify themselves [54]. Lessons learned from international events show that delays in the identification process impose concerns among relatives [33, 55].
Limitations
As all simulations, the “Vossa-test” carries the limitation of not representing reality and a real event. Although, a notable number of details were provided, corresponding to a large degree with results from similar MACSIM® SC tests and experiences from real events. The MACSIM® simulation has limitations in assessing the actual available physical spaces. The use of complementary simulation methods such as in situ figurant exercises, where stretches, beds and people are moved, is important. In future MACSIM® SC tests involving a rural hospital, it would be of interest to include the TC with all relevant wards as participants. A different scenario with Hazmat and burns would most likely result in a different patient distribution from the scene. Developing a digital solution replacing the protocol writers, scanning the treatment tags when leaving each test station and providing immediate test data for analysis would be an area of improvement. This would probably make the SC test easier to plan, conduct and evaluate.
Conclusions
The simulation system was found useful as an SC test tool at a small rural hospital, providing detailed data in terms of system, space, staff and supplies. The methodology could also be applied as a tool to enhance staff competency in MCI/MIs. Developing methods to promote the participants pre-test knowledge regarding the simulation system would be beneficial.
Data availability
No datasets were generated or analysed during the current study.
Abbreviations
- CBRNE:
-
Chemical, Biological, Radiological, Nuclear, Explosive
- ED:
-
Emergency department
- HCG:
-
Hospital command group
- HEMS:
-
Helicopter emergency medical service
- HGV:
-
Heavy goods vehicle
- HUH:
-
Haukeland University Hospital
- ICU:
-
Intensive care unit
- ISS:
-
Injury severity score
- MACSIM:
-
Mass Casualty Simulation System
- MCI:
-
Mass casualty incident
- MI:
-
Major incident
- MRMI:
-
Medical Response to Major Incident
- MTP:
-
Massive transfusion protocol
- NTC:
-
Non-trauma centre/ acute hospital with trauma function
- OOH:
-
Out-of-hours emergency primary health care
- OR:
-
Operating room
- SAR:
-
Search and rescue helicopter
- SC:
-
Surge capacity
- TC:
-
Trauma centre
- VH:
-
Voss Hospital
References
Lennquist S. Response to major incidents and disasters: an important part of trauma management. In: Oestern HJ, Trentz O, Uranues S, editors. General trauma care and related aspects. European manual of medicine. Berlin: Springer; 2014. pp. 31–68.
Waage S, Poole JC, Thorgersen EB. Rural hospital mass casualty response to a terrorist shooting spree. Br J Surg. 2013;100(9):1198–204.
Hirsch M, Carli P, Nizard R, Riou B, Baroudjian B, Baubet T, et al. The medical response to multisite terrorist attacks in Paris. Lancet. 2015;386(10012):2535–8.
Turégano-Fuentes F, Pérez-Díaz D, Sanz-Sánchez M, Alonso MO. Overall asessment of the response to terrorist bombings in trains, Madrid, 11 March 2004. Eur J Trauma Emerg Surg. 2008;34(5):433.
Hick JL, Barbera JA, Kelen GD. Refining surge capacity: conventional, contingency, and crisis capacity. Disaster Med Public Health Prep. 2009;3(2 Suppl):59–67.
Kaji A, Koenig KL, Bey T. Surge capacity for healthcare systems: a conceptual framework. Acad Emerg Med. 2006;13(11):1157–9.
Stratton SJ, Tyler RD. Characteristics of medical surge capacity demand for sudden-impact disasters. Acad Emerg Med. 2006;13(11):1193–7.
Traub M, Bradt DA, Joseph AP. The surge capacity for people in emergencies (SCOPE) study in Australasian hospitals. Med J Aust. 2007;186(8):394–8.
Blimark M, Örtenwall P, Lönroth H, Mattsson P, Boffard KD, Robinson Y. Swedish emergency hospital surgical surge capacity to mass casualty incidents. Scand J Trauma Resusc Emerg Med. 2020;28(1):12.
Peleg K, Kellermann AL. Enhancing hospital surge capacity for mass casualty events. JAMA. 2009;302(5):565–7.
Kanter RK, Moran JR. Hospital emergency surge capacity: an empiric new York statewide study. Ann Emerg Med. 2007;50(3):314–9.
Kelen GD, McCarthy ML, Kraus CK, Ding R, Hsu EB, Li G, et al. Creation of surge capacity by early discharge of hospitalized patients at low risk for untoward events. Disaster Med Pub Health Prep. 2009;3(S1):10–6.
Bradt DA, Aitken P, FitzGerald G, Swift R, O’Reilly G, Bartley B. Emergency department surge capacity: recommendations of the Australasian surge strategy working group. Acad Emerg Med. 2009;16(12):1350–8.
Montán KL, Khorram-Manesh A, Ortenwall P, Lennquist S. Comparative study of physiological and anatomical triage in major incidents using a new simulation model. Am J Disaster Med. 2011;6(5):289–98.
Montán KL, Hreckovski B, Dobson B, Örtenwall P, Montán C, Khorram-Manesh A, et al. Development and evaluation of a new simulation model for interactive training of the medical response to major incidents and disasters. Eur J Trauma Emerg Surg. 2014;40(4):429–43.
Montán KL, Riddez L, Lennquist S, Olsberg AC, Lindberg H, Gryth D, et al. Assessment of hospital surge capacity using the MACSIM simulation system: a pilot study. Eur J Trauma Emerg Surg. 2017;43(4):525–39.
Montán KL, Örtenwall P, Blimark M, Montán C, Lennquist S. A method for detailed determination of hospital surge capacity: a prerequisite for optimal preparedness for mass-casualty incidents. Eur J Trauma Emerg Surg. 2023;49(2):619–32.
Bachman SL, Demeter NE, Lee GG, Burke RV, Valente TW, Upperman JS. The impact of trauma systems on disaster preparedness: A systematic review. Clin Pediatr Emerg Med. 2014;15(4):296–308.
Helsedirektoratet. Nasjonalveileder for helsetjenestens organisering på skadested; 2020. https://www.helsedirektoratet.no/veiledere/helsetjenestens-organisering-pa-skadested/Helsetjenestens%20organisering%20på%20skadested%20–%20Nasjonal%20veileder.pdf/_/attachment/inline/9ecfef15-cefc-434d-a37c-387d3f6f8707:8ce3cc0fd8bf3fbea1d746bd68c1f71bcad47234/Helsetjenestens%20organisering%20på%20skadested%20-%20Nasjonal%20veileder.pdf. Accessed Dec 07 2024.
Hovedredningssentralen. Nasjonal veileder for planverk og samvirke i redningstjenesten; 2018. https://www.hovedredningssentralen.no/nasjonal-veileder-for-planverk-og-samvirke-i-redningstjenesten. Accessed Dec 07 2024.
Ugelvik KS, Thomassen Ø, Braut GS, Geisner T, Sjøvold JE, Montán C. Evaluation of prehospital preparedness for major incidents on a National level, with focus on mass casualty incidents. Eur J Trauma Emerg Surg. 2023. https://doiorg.publicaciones.saludcastillayleon.es/10.1007/s00068-023-02386-7.
Nasjonal Kompetansetjeneste for traumatologi. Nasjonal traumeplan. Versjon 1.1; 2020. https://traumeplan.no. Accessed 23 Sept 2024.
Dahlhaug M, Røise O. Nasjonalt traumeregister. Årsrapport for 2022 med plan for forbedringstiltak; 2023. https://nkt-traume.no/wp-content/uploads/2023/09/Arsrapport-NTR-2022.pdf. Accessed Dec 07 2024.
World Health Organization. Hospital emergency response checklist: an All-hazards tool for hospital administrators and emergency managers, WHO Regional Office for Europe; 2011. https://www.who.int/docs/default-source/documents/publications/hospital-emergency-response-checklist.pdf. Accessed 23 Sept 2024.
Soderin L, Agri J, Hammarberg E, Montan KL, Montan C. Hospital preparedness for major incidents in Sweden: a National survey with focus on mass casualty incidents. Eur J Trauma Emerg Surg. 2023;49(2):635–51.
Gabbe BJ, Veitch W, Curtis K, Martin K, Gomez D, Civil I, et al. Survey of major trauma centre preparedness for mass casualty incidents in Australia, Canada, England and new Zealand. EClinicalMedicine. 2020;21:100322.
Ugelvik KS, Thomassen Ø, Braut GS, Geisner T, Sjøvold JE, Montán C. A National study of in-hospital preparedness for mass casualty incidents and disasters. Eur J Trauma Emerg Surg. 2025;51(1):18.
Franc JM, Ingrassia PL, Verde M, Colombo D, Della Corte F. A simple graphical method for quantification of disaster management surge capacity using computer simulation and Process-control tools. Prehosp Disaster Med. 2015;30(1):9–15.
Bayram JD, Zuabi S. Disaster metrics: quantification of acute medical disasters in Trauma-Related multiple casualty events through modeling of the acute medical severity index. Prehosp Disaster Med. 2012;27(2):130–5.
Cooke L, Ramloll R, Hurst S, Garman K, Beedasy J, Pieper E et al. vTrain: A novel curriculum for patient surge training in a multi-user virtual environment (MUVE). Prehosp Disaster Med. 2013;1–8.
Abir M, Davis M, Sankar P, Wong AC, Wang SC. Design of a model to predict surge capacity bottlenecks for burn mass casualties at a large academic medical center. Prehosp Disaster Med. 2013;28(1):23–32.
Gaarder C, Jørgensen J, Kolstadbraaten KM, Isaksen KS, Skattum J, Rimstad R, et al. The twin terrorist attacks in Norway on July 22, 2011: the trauma center response. J Trauma Acute Care Surg. 2012;73(1):269–75.
Carli P, Telion C. Paris City disaster: response to the recent terror attacks and lessons learned. Curr Trauma Rep. 2018;4(2):96–102.
Hunt P. Lessons identified from the 2017 Manchester and London terrorism incidents. Part two: the reception and definitive care (hospital) phases. BMJ Mil Health. 2020;166(2):115–9.
Moss R, Gaarder C. Exercising for mass casualty preparedness. Br J Anaesth. 2022;128(2):67–70.
McLean CR, Lee YT, Jain S. Integration of Incident Management Simulation-based Training Applications. Proceedings of the 2007 Fall Simulation Interoperability Workshop. Orlando, US; 2007. https://tsapps.nist.gov/publication/get_pdf.cfm?pub_id=822749. Dec 07 2024.
Gulland A. It wasn’t a medical miracle—we made our own luck: lessons from London and Manchester terror attacks. BMJ. 2017;358:4309.
Rimstad R, Sollid SJ. A retrospective observational study of medical incident command and decision-making in the 2011 Oslo bombing. Int J Emerg Med. 2015;8:4.
Sollid SJ, Rimstad R, Rehn M, Nakstad AR, Tomlinson AE, Strand T, et al. Oslo government district bombing and Utøya Island shooting July 22, 2011: the immediate prehospital emergency medical service response. Scand J Trauma Resusc Emerg Med. 2012;20:3.
Glow SD, Colucci VJ, Allington DR, Noonan CW, Hall C. Managing multiple-casualty incidents: a rural medical preparedness training assessment. Prehosp Disaster Med. 2013;28(4):334–41.
41 Sarzynski SH, Mancera AG, Yek C, Ronsenthal NA, Kartashov A, Hick J, et al. Trends in patient transfers from overall and Caseload-Strained US hospitals during the COVID-19 pandemic. JAMA Netw Open. 2024;7(2):e2356174.
Hirshberg A, Scott BG, Granchi T, Wall MJ, Mattox KL, Stein M. How does casualty load affect trauma care in urban bombing incidents? A quantitative analysis. J Trauma. 2005;58(4):686–95.
Aylwin CJ, König TC, Brennan NW, Shirley PJ, Davies G, Walsh MS, et al. Reduction in critical mortality in urban mass casualty incidents: analysis of triage, surge, and resource use after the London bombings on July 7, 2005. Lancet. 2006;368(9554):2219–25.
Menes K, Tintinalli J, Plaster L. How One Las Vegas ED Saved Hundreds of Lives After the Worst Mass Shooting in U.S. History. Emergency Physians Montly. 2017. https://epmonthly.com/article/not-heroes-wear-capes-one-las-vegas-ed-saved-hundreds-lives-worst-mass-shooting-u-s-history/. Accessed Dec 7 2024.
Meyer E, Vincent LE, Fox EE, OʼKeeffe T, Inaba K, Bulger E, et al. Every minute counts: time to delivery of initial massive transfusion cooler and its impact on mortality. J Trauma Acute Care Surg. 2017;83(1):19–24.
Holcomb JB, Tilley BC, Baraniuk S, Fox EE, Wade CE, Podbielski JM, et al. Transfusion of plasma, platelets, and red blood cells in a 1:1:1 vs a 1:1:2 ratio and mortality in patients with severe trauma: the PROPPR randomized clinical trial. JAMA. 2015;313(5):471–82.
Hagen KG, Strandenes G, Kristoffersen EK, Braathen H, Sivertsen J, Bjerkvig CK, et al. A whole blood based resuscitation strategy in civilian medical services: experience from a Norwegian hospital in the period 2017–2020. Transfusion. 2021;61(Suppl 1):22–31.
Sunde GA, Bjerkvig C, Bekkevold M, Kristoffersen EK, Strandenes G, Bruserud Ø, et al. Implementation of a low-titre whole blood transfusion program in a civilian helicopter emergency medical service. Scand J Trauma Resusc Emerg Med. 2022;30(1):65.
Kaada SH, Apelseth TO, Hagen KG, Kristoffersen EK, Gjerde S, Sønstabø K, et al. How do I get an emergency civilian walking blood bank running? Transfusion. 2019;59(S2):1446–52.
Apelseth TO, Strandenes G, Kristoffersen EK, Hagen KG, Braathen, Hervig T. How do I implement a whole blood-based blood preparedness program in a small rural hospital? Transfusion. 2020;60(12):2793–800.
Apelseth TO, Arsenovic M, Strandenes G. The Norwegian blood preparedness project: A whole blood program including civilian walking blood banks for early treatment of patients with life-threatening bleeding in municipal health care services, ambulance services, and rural hospitals. Transfusion. 2022;62(S1):22–9.
Holcomb JB, Spinella PC, Apelseth TO, Butler FK, Cannon JW, Cap AP, et al. Civilian walking blood bank emergency preparedness plan. Transfusion. 2021;61(S1):313–25.
Gjørv AB, Auglend RL, Bokhari L et al. Rapport fra 22. juli-kommisjonen. NOU 2012:14; 2012. Accessed Dec 7 2024. https://www.regjeringen.no/contentassets/bb3dc76229c64735b4f6eb4dbfcdbfe8/no/pdfs/nou201220120014000dddpdfs.pdf
Osborn D, Easthope L. Identification of the incapacitated patient in mass casualty events: an exploration of challenges, solutions, and barriers. Disaster Med Pub Health Prep. 2019;13(2):338–44.
Strom KJ, Eyerman J. Interagency Coordination: Lessons Learned From the 2005 London Train Bombings. NIJ J. 2008(261). https://nij.ojp.gov/library/publications/nij-journal-issue-no-261. Accessed Dec 7 2024.
Acknowledgements
We want to thank the management at Voss Hospital and the participating organisations for their commitment and support in the planning and conduction of the “Vossa-test”. Further, we express our gratitude to the test staff and participants for making the “Vossa-test” a reality by professional performance and loads of enthusiasm.
Funding
Open access funding provided by University of Bergen.
The project was partially financed by Lærdal Foundation. The Western Norway Regional Trauma network provided whiteboards and the disaster committee at Haukeland University Hospital provided wests. Open access provided through University of Bergen.
Author information
Authors and Affiliations
Contributions
All authors have been involved in meetings and planning of the “Vossa-test”. All authors were involved in the conduction of the SC test, except one author that had to cancel on the test day due to vacancy duty call. CM, KSU and TG were involved in developing new patient cards, including conferring with specialist when needed. KSU translated the MACSIM® system to Norwegian language and to fit the Norwegian trauma system. KLL and CM facilitated the production of the MACSIM® system. KSU has analysed the data. All authors have been included in the writing process and have approved the manuscript.
Corresponding author
Ethics declarations
Ethics and consent
Participation in the “Vossa-test” and the following web-based survey was voluntary. As neither patients nor real persons were involved as subjects for medical examination or treatment, a request for ethics approval according to the Health Research Act of 2008 was not applicable. The project was performed according to the requirements in the Personal Data Act of 2017. The project is registered in E-protocol within Helse-Bergen Health Trust (registration number 3478–3478). As a health service research project, Guidelines for Research Ethics in the Social Sciences and the Humanities (Revised version 2023) were adhered to at all phases of the project and development of this article.
Consent for publication
Participation in the post-test web-based survey was voluntary. A cover letter followed to link to the survey. In the cover letter the participants are informed that the data will be used in scientific publication as well as in the internal evaluation report provided to VH.
Competing interests
The co-author K. Lennquist Montán has copyright to the MACSIM® system and C. Montán is Secretary General for the International Association for Promotion of Education and Training in Major Incidents and Disasters (MRMID) which owns the MRMI courses. MRMI is a non-profit international organisation. No conflict of interest for the other authors.
Additional information
Publisher’s note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Electronic supplementary material
Below is the link to the electronic supplementary material.
Rights and permissions
Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/. The Creative Commons Public Domain Dedication waiver (http://creativecommons.org/publicdomain/zero/1.0/) applies to the data made available in this article, unless otherwise stated in a credit line to the data.
About this article
Cite this article
Ugelvik, K.S., Montán, K.L., Thomassen, Ø. et al. A full response chain surge capacity test of a small rural hospital, prehospital resources and collaborating organisations. Scand J Trauma Resusc Emerg Med 33, 55 (2025). https://doiorg.publicaciones.saludcastillayleon.es/10.1186/s13049-025-01372-9
Received:
Accepted:
Published:
DOI: https://doiorg.publicaciones.saludcastillayleon.es/10.1186/s13049-025-01372-9